Build a suit-ready frame for your big day


14-week groom prep to add size where it shows most.




Built around your wedding timeline

Build your frame EARLY.


  • Start at least 16 weeks out

  • Get measured 6 weeks before the wedding

  • Hold your size steady into the big day


Built to Add Size
Where It Shows


3-Phase Full-body training for
visible size:


Phase 1 — Foundation

Build the base with muscular endurance, mobility, and stability.


Phase 2 — Size

Focus on adding visible muscle where it makes the biggest difference in your frame.


Phase 3 — Strength & Maintenance

Maintenance phase where we build strength and maintain our muscle.



What You Get

A clear buildout for adding size, staying on track, and showing up ready.


  • 14 weeks of structured groom prep

  • 3-phase training plan

  • Full-body workouts with a muscle-building focus

  • Mobility work built into the process

  • Nutrition guidance to support size

  • Coaching and accountability throughout



Who This Is For

For engaged men who want more size before the big day.


  • Look bigger and stronger

  • Fill out the suit better

  • Train with structure

  • Stay consistent

  • Show up ready


Client Results


Client Testimonials